PLEASE USE THE FOLLOWING FILTERS TO NARROW DOWN YOUR SEARCH RESULTS
We recommend using the Chrome browser for optimal performance of the tool.
PICTURE | NAME | BUILDING TYPE | SOLUTIONS | TYPE OF INTERVENTION | MODEL | ESCALATORS AND MOVING WALKS | YEAR | LOAD | COUNTRY | PANORAMIC | DESCRIPTION | portfolio_meta_wpcf_imagendistribucionen |
---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() |
AIRBUS MILITARY | Office | Passengers | New Construction | MP GO | No | 2017 | 640kg | Spain | No | AIRBUS MILITARY PLANT, EL PUERTO SANTA MARÍA The office building at the Airbus Military plant in El Puerto de Santa María has an MP GO! lift with a capacity of up to 630 kg, 2 stops and a semi-panoramic car which has glass landing doors with vision panels. | ![]() ![]() ![]() |
![]() |
SUPERCARMELA MARKET | Shopping Centre | Goodlifts | New Construction | MP Hydro | No | 2019 | 2500kg | Spain | No | A chain of supermarkets experiencing rapid growth in the provinces of Cadiz and Seville.
|
![]() |
![]() |
SUPERCARMELA MARKET | Shopping Centre | Passengers | New Construction | MP MEGA | No | 2019 | 1600kg | Spain | No | A chain of supermarkets experiencing rapid growth in the provinces of Cadiz and Seville.
|
![]() |
![]() |
VEGHEL STORE | Office | Goodlifts | Existing Building | MP Hydro | No | 2019 | 3500kg | The Netherlands | No | Here, MP installed two lifts, namely:
In the words of our client:
‘This project is a world first as far as warehouse renovations go and includes an office building spanning approximately 32,000 square metres. It’s a major, sustainable project, which has been rated as ‘Excellent’ according to BREEAM, meaning the building exceeds the Dutch sustainability standard. It’s always a big challenge when we’re talking about both the preliminary and implementation phases’, said our client and project lead Noud Leijen. |
![]() ![]() ![]() |
![]() |
VEGHEL STORE | Residential | Passengers | Existing Building | MP GO | No | 2019 | 1000kg | The Netherlands | Yes | Here, MP installed two lifts, namely:
In the words of our client:
‘This project is a world first as far as warehouse renovations go and includes an office building spanning approximately 32,000 square metres. It’s a major, sustainable project, which has been rated as ‘Excellent’ according to BREEAM, meaning the building exceeds the Dutch sustainability standard. It’s always a big challenge when we’re talking about both the preliminary and implementation phases’, said our client and project lead Noud Leijen. |
![]() ![]() |
![]() |
RONDA TOURISTIC APARTMENTS | Hotel | Accessibility | Existing Building | MP MOBI | No | 2019 | 480kg | Spain | Yes | - | ![]() ![]() |
![]() |
B22/24 | Residential | Passengers | New Construction | MP GO | No | 2016 | 630kg | The Czech Republic | No | - | |
![]() |
BANK 72 | Residential | Accessibility | Existing Building | MP MOBI | No | 2019 | - | The Netherlands | No | - | ![]() ![]() ![]() |
![]() |
BANK 72 | Residential | Passengers | Existing Building | MP GO | No | 2019 | 1000kg | The Netherlands | No | - | ![]() |
![]() |
BIUROWIEC GAZOWNI | Office | Passengers | New Construction | MP Hydro | No | 2011 | 630kg | Poland | Yes | - | <img class="foto2 alignleft" style="object-fit: cover; max-height: 310px; padding-bottom: 10px;" src="https://portal-public.s3.eu-west-1.amazonaws.com/showcaseMP/MP%20H/Biurowiec%20Gazowni/Biurowiec%20Gazowni%201.JPG" alt="" width="400px" height="" /> <img class="foto2 alignleft" style="object-fit: cover; max-height: 310px; padding-bottom: 10px;" src="https://portal-public.s3.eu-west-1.amazonaws.com/showcaseMP/MP%20H/Biurowiec%20Gazowni/Biurowiec%20Gazowni%202%20.JPG" alt="" width="400px" height="" /> <img class="foto2 alignleft" style="object-fit: cover; max-height: 310px; padding-bottom: 10px;" src="https://portal-public.s3.eu-west-1.amazonaws.com/showcaseMP/MP%20H/Biurowiec%20Gazowni/Biurowiec%20Gazowni%203.JPG" alt="" width="400px" height="" /> |
![]() |
CAIXAFORUM | Public Building | Passengers | New Construction | ESCALATORS | MP Step | 2017 | - | Spain | No | This building, which was designed by the architect Guillermo Vázquez Consuegra, has an impressive aluminium foam canopy which aims to become an icon of the building and the city as a whole, and boasts 7,500 square metres of underground usable floor area. It is a modern area made from aluminium and concrete with an industrial feel, which, in addition to exhibition halls, has an auditorium which can seat 276 people, a terrace with a panoramic view and two multipurpose rooms designed to host music events, conferences and workshops for children. The site forms part of an ambitious project which aims to transform the area, which is not a place residents of the city tend to visit, into a cultural hub. It is here, at CaixaForum Sevilla, that MP installed 3 lifts and 6 escalators to help visitors get around the site. Of these installations, the two fully panoramic hydraulic lifts with a capacity of up to 21 people stand out. One of these transports visitors from the large square under the Pelli Tower to the building’s lobby area, whilst the other takes visitors from the multipurpose rooms to the food area. | ![]() ![]() |
![]() |
CAIXAFORUM | Public Building | Passengers | New Construction | MP Hydro | No | 2017 | 750kg | Spain | Yes | This building, which was designed by the architect Guillermo Vázquez Consuegra, has an impressive aluminium foam canopy which aims to become an icon of the building and the city as a whole, and boasts 7,500 square metres of underground usable floor area. It is a modern area made from aluminium and concrete with an industrial feel, which, in addition to exhibition halls, has an auditorium which can seat 276 people, a terrace with a panoramic view and two multipurpose rooms designed to host music events, conferences and workshops for children. The site forms part of an ambitious project which aims to transform the area, which is not a place residents of the city tend to visit, into a cultural hub. It is here, at CaixaForum Sevilla, that MP installed 3 lifts and 6 escalators to help visitors get around the site. Of these installations, the two fully panoramic hydraulic lifts with a capacity of up to 21 people stand out. One of these transports visitors from the large square under the Pelli Tower to the building’s lobby area, whilst the other takes visitors from the multipurpose rooms to the food area. | ![]() ![]() ![]() |
![]() |
CAJA MÁGICA | Public Building | Passengers | New Construction | MP GO | No | 2009 | 750kg | Spain | Yes | MP designed, manufactured and installed a total of 24 lifts for the stadium La Caja Mágica, an emblematic project in the Spanish capital designed by the renowned architect Dominique Perrault. The site now hosts the Madrid Open, amongst many other events. The solutions were customised to fit in perfectly with the architecture of the stadium. The lifts installed include goods lifts, stainless-steel passenger lifts and panoramic lifts. | ![]() |
![]() |
CAP 18 PARIS | Shopping Centre | Goodlifts | New Construction | MP MEGA | No | 2018 | - | France | No | - | ![]() |
![]() |
ARMJEM CHAPEL | Public Building | Passengers | New Construction | MP GO | No | 2019 | 1000kg | The Netherlands | No | - | ![]() ![]() ![]() |
![]() |
FRANCE MEGÉVE PRIVATE HOUSE | Residential | Passengers | New Construction | MP Hydro | No | 2019 | - | France | No | This lift is installed in a villa in Haute Savoie Megève in France. The decoration has been made by the customer all in aged wood just like the interior of the villa. | ![]() ![]() ![]() |
![]() |
STONE HOUSE | Public Building | Passengers | Existing Building | MP FLEX | No | 2019 | 450kg | Spain | Yes | This building was built by the stonemason Antonio Aguilera, known as ‘El Gronzón’, between 1931 and 1960 using blocks of stone from the nearby quarries. The restoration of Casa de la Piedra involved carrying out work on its structure and improving the accessibility of the building for visitors. As part of this project, MP installed an MP Flex panoramic lift. | |
![]() |
CUENCA CASTLE | Public Building | Passengers | Existing Building | MP Hydro | No | 2010 | 450kg | Spain | Yes | - | |
![]() |
CZECH SHOPING CENTER | Shopping Centre | Passengers | New Construction | MP GO | No | 2015 | 630kg | The Czech Republic | No | - | |
![]() |
ZAMEK CULTURAL CENTER | Public Building | Passengers | Existing Building | MP FLEX | No | 2012 | 630kg | Poland | Yes | MP installed gearless lifts in one of Poznán’s most emblematic buildings, the historic Imperial Castle (Zamek), as part of its restoration. The design and installation of these lifts were highly complex due to the nature of the building and the lack of space. | ![]() ![]() |
![]() |
THE NETHERLANDS PHYSIOTHERAPY CENTER | Hospital | Accessibility | Existing Building | MP MOBI | No | 2018 | 1000kg | The Netherlands | No | MP installed a lift with two stops at the Higher Medical Centre for Physiotherapy in the Netherlands. The MP MOBI 6XL lift has a capacity of up to 1000 kg and is able to transport massage tables. The result was an outstanding solution involving minimal structural work. | ![]() ![]() ![]() |
![]() |
HC MARBELLA CLINIC | Hospital | Bedlifts | New Construction | MP MEGA | No | 2019 | 1600kg | Spain | No | Here, we installed a bed lift with a capacity of up to 1600 kg / 21 people and a 180 º double landing which can be selected on floors -1 and 0 (where there are double doors). An access code must be entered inside the car to enter the operating theatres. It is equipped with an ecoGo controller with remote monitoring, which allows us to see the status of the lift in real time, something which is particularly useful given the distance. | ![]() ![]() ![]() |
![]() |
STEJARII CLUB | Public Building | Passengers | New Construction | MP Hydro | No | 2014 | 1000kg | Romania | Yes | MP designed a circular panoramic lift for the lobby of the Stejarii Country Club, one of Rumania’s most modern and exclusive country clubs. The hydraulic lift has a glass roof and a low operator, meaning passengers are able to enjoy an unobstructed view from inside the car. | ![]() ![]() ![]() |
![]() |
JAGUAR DEALER | Shopping Centre | Carlifts | New Construction | MP Hydro | No | 2005 | 4000kg | Spain | No | - | ![]() ![]() ![]() |
![]() |
CONFORAMA | Shopping Centre | Passengers | New Construction | MP Hydro | No | 2019 | 4350kg | Spain | No | 1 MP STRONGO hydraulic lift with a machine room, a capacity of up to 4350 kg / 58 people, 2 stops and a speed of 0.3 m/s. A car measuring 2830 mm wide x 5380 mm deep x 3000 mm high, with 3000-mm-high 6-panel automatic central doors with a 2900-mm clear entrance. | ![]() |
![]() |
UKRANIA PUBLIC BUILDING | Public Building | Passengers | Modernisation | MP GO Room | No | 2018 | - | Ukranie | No | - | ![]() |
![]() |
ESS EUROPEAN SPALLATION SOURCE | Office | Passengers | New Construction | MP GO | No | 2018 | 5000kg | Sweden | Yes | MP was chosen to provide the lift solutions as part of this emblematic project for the Swedish giant SKANSKA, in Lund (Sweden). The pan-European project, involving 17 different countries and with a cost of 1.9 billion euros, will see a multidisciplinary research facility based on the world’s most powerful neutron source built. It is the most costly project ever undertaken in Sweden and has been designed by Henning Larsen Architects. | ![]() |
![]() |
HAPAM BUNSCHOTEN | Office | Passengers | New Construction | MP GO | No | 2020 | 630kg | The Netherlands | Yes | - | ![]() ![]() ![]() |
![]() |
HAVENHUIS | Office | Passengers | New Construction | MP GO | No | 2016 | - | Belgium | No | MP took part in this cutting-edge project undertaken by the renowned architect Zaha Hadid, supplying a total of 7 lifts and homelifts for the headquarters of the Antwerp Port Authority. The project is at the centre of the redevelopment of one of Europe’s most important ports. | ![]() ![]() ![]() |
![]() |
HIRSCHMANN AUTOMOTIVE | Office | Passengers | New Construction | MP FLEX | No | 2019 | 630kg | The Czech Republic | Yes | MP installed 5 lifts for this automotive company in Vsetín, Czech Republic, namely:
|
![]() ![]() ![]() |
![]() |
HIRSCHMANN AUTOMOTIVE | Office | Passengers | New Construction | MP GO | No | 2018 | 2000kg | The Czech Republic | No | MP installed 5 lifts for this automotive company in Vsetín, Czech Republic, namely:
|
![]() ![]() ![]() |
![]() |
CANCUN GENERAL HOSPITAL | Hospital | Bedlifts | New Construction | MP MEGA | No | 2017 | 2000kg | Mexico | No | - | ![]() |
![]() |
AZUL FIVE HOTEL | Office | Passengers | New Construction | MP GO | No | 2013 | 1000kg | Mexico | Yes | - | ![]() |
![]() |
KOKPUNKTEN HOTEL | Hotel | Passengers | New Construction | MP GO | No | 2020 | 1000kg | Sweden | Yes | MP has installed 2 lifts MP GO! Evolution1000 kg with a speed of 2.5 m/s in the HOTEL KOKPUNKTEN in Västeras. This is an existing building where MP had previously installed three MP GO! Evolution 1000 kg lifts at 1.6 m/s. | ![]() ![]() ![]() |
![]() |
ZIMBRU HOTEL | Hotel | Passengers | Modernisation | MP GO | No | 2016 | 480kg | Romania | No | - | ![]() |
![]() |
IKEA | Shopping Centre | Passengers | New Construction | ESCALATORS | MP Step | 2010 | - | Spain | No | MP is one of IKEA’s global suppliers. The lifts and escalators at its stores must comply with strict requirements in terms of quality, traffic and performance, due to the large number of people who use them on their way in and out of the stores. MP has MP GO! Mega, MP H and MP GO! Evolution lifts, as well as escalators, in stores in Spain, Sweden, England, Scotland, France, Belgium and Malaysia. | ![]() ![]() ![]() |
![]() |
IKEA | Shopping Centre | Goodlifts | New Construction | MP MEGA | No | 2010 | - | Spain | No | MP is one of IKEA’s global suppliers. The lifts and escalators at its stores must comply with strict requirements in terms of quality, traffic and performance, due to the large number of people who use them on their way in and out of the stores. MP has MP GO! Mega, MP H and MP GO! Evolution lifts, as well as escalators, in stores in Spain, Sweden, England, Scotland, France, Belgium and Malaysia. | |
![]() |
LIDL BILTHOVEN | Shopping Centre | Passengers | New Construction | ESCALATORS | MP Step Walk | 2019 | - | The Netherlands | No | MP installed a lift and moving walkway in the car park of a LIDL store in Bilthoven, namely:
These 3 products are used to connect the car park to the Lidl store above it. |
![]() ![]() |
![]() |
LIDL BILTHOVEN | Shopping Centre | Passengers | New Construction | MP GO | No | 2019 | 1000kg | The Netherlands | No | MP installed a lift and moving walkway in the car park of a LIDL store in Bilthoven, namely:
These 3 products are used to connect the car park to the Lidl store above it. |
![]() |
![]() |
MÁSÔVA | Residential | Passengers | New Construction | MP Hydro | No | 2020 | 480kg | The Czech Republic | No | - | ![]() ![]() ![]() |
![]() |
MAX IV | Office | Passengers | New Construction | MP GO | No | 2015 | 1000kg | Sweden | Yes | This project involves a building in the shape of a giant ring with a circumference of 528 metres, one metre more than the Colosseum in Rome. One of the biggest challenges of the project have been the extremely strict requirements concerning vibrations. MP developed a special solution involving an MP GO! Evolution lift, suitable for a building where vibrations are measured on a nanoscale. The land around the site has, amongst others things, slopes with a functional wave pattern, which reduce ground vibrations. This project has been exemplary in terms of sustainability from start to finish, and the result is a new city district now emerging in northern Lund. | ![]() ![]() ![]() |
![]() |
ALGIERS UNDERGROUND | Transport | Passengers | New Construction | MP GO | No | 2015 | - | Algeria | Yes | MP manufactured and installed a total of 24 escalators and 12 (mainly panoramic) lifts for the project to extend line 1B of the Algiers Metro, a project undertaken by the consortium CRK (made up of Colas Rail and KouGC) for the state company EMA, under the supervision of the engineering firm ENSITRANS. | ![]() ![]() ![]() |
![]() |
SEVILLE UNDERGROUND | Transport | Passengers | New Construction | ESCALATORS | MP Step Heavy | 2011 | - | Spain | No | MP designed, manufactured and installed all the lifts and escalators for the entire line of the Seville Metro. The project involved 43 gearless lifts and 52 escalators spread across 21 stations. The lifts are designed to handle a large number of passengers, including tourists and residents. | ![]() ![]() |
![]() |
SEVILLE UNDERGROUND | Transport | Passengers | New Construction | MP GO | No | 2009 | 750kg | Spain | Yes | MP designed, manufactured and installed all the lifts and escalators for the entire line of the Seville Metro. The project involved 43 gearless lifts and 52 escalators spread across 21 stations. The lifts are designed to handle a large number of passengers, including tourists and residents. | ![]() ![]() ![]() |
![]() |
METROPOL PARASOL | Public Building | Passengers | New Construction | ESCALATORS | MP Step Heavy | 2011 | - | Spain | No | Solutions:
|
![]() |
![]() |
METROPOL PARASOL | Public Building | Passengers | New Construction | MP GO | No | 2011 | 900kg | Spain | Yes | Solutions:
|
![]() |
![]() |
RUDOLF MINE | Public Building | Passengers | Modernisation | MP V | No | 2010 | 750kg | Romania | Yes | - | |
![]() |
MULTIMODAL TRANSPORT CENTER MORLAIX | Transport | Passengers | New Construction | MP GO | No | 2017 | 630kg | France | Yes | This building has an MP GO! Evolution panoramic lift, designed for high levels of traffic. | ![]() ![]() ![]() |
![]() |
MUNKSJÖSTADEN | Office | Passengers | New Construction | MP GO | No | 2020 | 1250kg | Sweden | No | MP designed the lift solutions, which include, amongst others, 3 MP GO! Evolution lifts with a speed of 2.5 m/s, installed in the residential area and main office building. They feature custom cars with lighting on the walls, rounded corners and an AMBIENTUM panel with a photo chosen by the client. | ![]() ![]() ![]() |
![]() |
POZNAN AIRPORT | Transport | Passengers | New Construction | ESCALATORS | MP Step Heavy | 2011 | - | Poland | No | - | |
![]() |
ALMERIA CARREFOUR | Shopping Centre | Passengers | New Construction | ESCALATORS | MP Step Walk | 2018 | - | Spain | No | - | ![]() ![]() |
![]() |
WIATRACZNA GALERY | Public Building | Passengers | New Construction | MP Hydro | No | 2011 | 630kg | Poland | Yes | - | |
![]() |
COLÓN MARKET | Shopping Centre | Passengers | New Construction | ESCALATORS | MP Step | 2007 | - | Spain | No | - | ![]() ![]() |
![]() |
LYON OFFICES | Office | Passengers | New Construction | MP FLEX | No | 2019 | 480kg | France | Yes | - | ![]() ![]() |
![]() |
FRANCE OFFICES | Office | Passengers | New Construction | MP GO | No | 2013 | - | France | Yes | - | |
![]() |
ANTWERP PARKING | Residential | Carlifts | New Construction | MP Hydro | No | 2019 | - | Belgium | Yes | MP installed a lift in a luxury apartment building in the centre of Antwerp. The client chose MP because we were able to provide a lift for reduced headroom (3400 mm) and a 1200-mm pit. The solution was manufactured in accordance with standards EN 81-20/50. The shaft measures 3200 mm x 5800 mm. | ![]() ![]() |
![]() |
CZECH PARKING 2 | Residential | Carlifts | New Construction | MP Hydro | No | 2016 | 4000kg | The Czech Republic | No | - | |
![]() |
CZECH PARKING | Residential | Carlifts | New Construction | MP Hydro | No | 2014 | 4000kg | The Czech Republic | No | - | ![]() ![]() ![]() |
![]() |
RUE FRANCOIS PREMIER PARIS PARKING | Transport | Passengers | New Construction | MP GO | No | 2017 | 1000kg | France | No | - | ![]() ![]() ![]() |
![]() |
PORCELANOSA | Shopping Centre | Passengers | New Construction | ESCALATORS | MP Step | 2009 | - | Spain | No | - | ![]() ![]() ![]() |
![]() |
ITER, CADARACHE | Office | Goodlifts | New Construction | MP GO | No | 2016 | 12000kg | France | Yes | The International Thermonuclear Experimental Reactor (ITER) is a highly complex international engineering project, which involves building an experimental tokamak nuclear fusion reactor. The project is run by the European Union, the USA, Japan, India, South Korea, Russia and China. MP has supplied the 9 lifts for the site. These are highly complex from a technical point of view, as they are designed to withstand earthquakes of up to 3 on the Richter scale, design accelerations of up to 10 m/s2, the magnetic fields generated by the reactor and radiation. Two of them are gearless goods lifts with a capacity of up to 12,000 kg. This is the fifth most costly project in history, only eclipsed by the likes of the Manhattan Project and the International Space Station. | ![]() ![]() |
![]() |
CARADACHE | Office | Goodlifts | New Construction | MP GO | No | 2016 | 12000kg | France | No | The International Thermonuclear Experimental Reactor (ITER) is a highly complex international engineering project, which involves building an experimental tokamak nuclear fusion reactor. The project is run by the European Union, the USA, Japan, India, South Korea, Russia and China. MP has supplied the 9 lifts for the site. These are highly complex from a technical point of view, as they are designed to withstand earthquakes of up to 3 on the Richter scale, design accelerations of up to 10 m/s2, the magnetic fields generated by the reactor and radiation. Two of them are gearless goods lifts with a capacity of up to 12,000 kg. This is the fifth most costly project in history, only eclipsed by the likes of the Manhattan Project and the International Space Station. | ![]() ![]() |
![]() |
PULAWSKA | Residential | Passengers | Existing Building | MP FLEX | No | 2017 | 630kg | Poland | No | - | ![]() ![]() |
![]() |
MADRID REFURBISHMENT | Office | Modular Structure | Existing Building | MP Hydro | No | 2008 | - | Spain | No | - | ![]() |
![]() |
CZECH REPUBLIC RESIDENTIAL | Residential | Passengers | Existing Building | MP GO | No | 2018 | - | The Czech Republic | No | - | ![]() |
![]() |
CZECH REPUBLIC RESIDENTIAL | Public Building | Passengers | Existing Building | MP FLEX | No | 2019 | 480kg | The Czech Republic | Yes | - | ![]() ![]() ![]() |
![]() |
CZECH REPUBLIC RESIDENTIAL | Residential | Passengers | Existing Building | MP FLEX | No | 2019 | 480kg | The Czech Republic | Yes | - | ![]() ![]() ![]() |
![]() |
CZECH REPUBLIC RESIDENTIAL | Residential | Accessibility | Existing Building | MP MOBI | No | 2017 | 320kg | The Czech Republic | Yes | - | |
![]() |
CZECH REPUBLIC RESIDENTIAL | Residential | Passengers | Existing Building | MP Hydro | No | 2014 | 480kg | The Czech Republic | Yes | - | ![]() ![]() ![]() |
![]() |
SKODA | Office | Passengers | Modernisation | MP GO Room | No | 2018 | 1000kg | The Czech Republic | No | - | ![]() ![]() ![]() |
![]() |
SPIRIDON UPU HOSPITAL | Hospital | Bedlifts | New Construction | MP MEGA | No | 2017 | 1250kg | Romania | No | - | ![]() |
![]() |
VESLAŘSKÁ SCHOOL | Public Building | Passengers | Existing Building | MP FLEX | No | 2019 | 480kg | The Czech Republic | Yes | - | ![]() ![]() ![]() |
![]() |
CÁDIZ RESIDENTIAL | Residential | Passengers | Existing Building | MP GO | No | 2020 | 480kg | Spain | No | - | ![]() ![]() ![]() |
![]() |
SPAIN RESIDENTIAL | Residential | Passengers | Existing Building | MP GO | No | 2019 | - | Spain | No | - | |
![]() |
SPAIN RESIDENTIAL | Residential | Passengers | Existing Building | MP FLEX | No | 2019 | - | Spain | No | - | ![]() ![]() ![]() |
![]() |
SPAIN RESIDENTIAL | Residential | Accessibility | Existing Building | MP MOBI | No | 2017 | - | Spain | No | - | ![]() ![]() |
![]() |
SPAIN RESIDENTIAL | Residential | Passengers | Existing Building | MP Hydro | No | 2016 | - | Spain | Yes | - | ![]() |
![]() |
SEDMOY CONTINENT | Shopping Centre | Passengers | New Construction | ESCALATORS | MP Step Walk | 2006 | - | Russia | No | 2 x MP PONT
|
|
![]() |
FRANCE RESIDENTIAL | Residential | Modular Structure | Existing Building | MP GO | No | 2016 | - | France | No | - | |
![]() |
THE NETHERLANDS RESIDENTIAL | Residential | Passengers | Existing Building | MP FLEX | No | 2014 | - | The Netherlands | No | - | ![]() |
![]() |
THE NETHERLANDS RESIDENTIAL | Residential | Passengers | Modernisation | MP V | No | 2013 | - | The Netherlands | No | - | ![]() ![]() ![]() |
![]() |
THE NETHERLANDS RESIDENTIAL | Residential | Passengers | New Construction | MP GO | No | 2019 | - | The Netherlands | No | - | ![]() ![]() |
![]() |
STRUCTURE RESIDENTIAL THE NETHERLANDS | Residential | Passengers | Existing Building | MP GO | No | 2013 | - | The Netherlands | Yes | - | |
![]() |
SOTOMARKET | Public Building | Passengers | New Construction | ESCALATORS | MP Step Walk | 2005 | - | Spain | No | - | ![]() ![]() ![]() |
![]() |
CATUJA CITE THEATRE | Public Building | Passengers | New Construction | ESCALATORS | MP Step | 2012 | - | Spain | No | The SGAE theatre on Isla de la Cartuja, which had been closed for 6 years, has finally opened its doors to the public again under the new name ‘Cartuja Center Cite’. The site spans more than 33,000 square metres and has 13 lifts, 4 escalators and 3 homelifts. | ![]() |
![]() |
WOONBOULEVARD POORTVLIET | Shopping Centre | Passengers | New Construction | ESCALATORS | MP Step | 2011 | - | The Netherlands | No | This is the largest furniture store in Benelux. | |
![]() |
WOONBOULEVARD POORTVLIET | Shopping Centre | Passengers | New Construction | MP Hydro | No | 2011 | - | The Netherlands | Yes | This is the largest furniture store in Benelux. | ![]() ![]() ![]() |
![]() |
BOWLINGCENTER HARDERWIJK | Office | Accessibility | Existing Building | MP MOBI | No | 2018 | 320kg | The Netherlands | No | MP installed an MP MOBI lift with 2 stops at this bowling alley. For this project, we created a glass structure and a special car made partly from glass. MP was chosen to install the lift in the building, which houses a bowling area and restaurant, as we were able to offer a solution without a pit which has the appearance of a traditional lift. The lift can be used by those in a wheelchair or with a pram. | ![]() ![]() ![]() |
![]() |
FRANCE OFFICES | Office | Accessibility | Existing Building | MP MOBI | No | 2017 | 500kg | France | Yes | - | ![]() ![]() |
![]() |
THE STING | Shopping Centre | Accessibility | Existing Building | MP MOBI | No | 2019 | 630kg | Netherlands | No | MP installed a lift in The Sting, a famous fashion store in the Dutch city of Deventer. The project, which involved an old building on a central shopping street, was particularly challenging due to the speed of the renovation and the small pit, which is typical of such an old building. The solution provided by MP is an MP MOBI with 2 stops and a capacity of up to 630 kg, which is able to transport wheelchairs and prams. The lift has a standard car and its floor, which was provided by the client, matches that of the store. This project was carried out for a client for whom MP has undertaken several similar projects involving renovating old buildings, where fast solutions and delivery times were required from us. | ![]() ![]() ![]() |
![]() |
THE NETHERLANDS HOSPITAL | Hospital | Bedlifts | New Construction | MP MEGA | No | 2013 | - | The Netherlands | No | - | ![]() |
![]() |
DENTAMERICA | Office | Passengers | New Construction | MP GO | – | 2022 | 450 kg | Romania | No | The building is the headquarters of a distributor of medical equipment and medicines in the dentaland and is located in a select neighborhood with elegant historical buildings and therefore the client wanted special finishes. The owner of the company chose the Ambientum cabin with this beautiful forest landscape to feel closer to nature in a very crowded city. | ![]() ![]() ![]() |
![]() |
NORDIS Mamaia | Residential | Passengers | Existing Building | MP GO | – | 2022 | 1500 kg | Romania | No | Hotel and residential complex of 5 stars It is perhaps the most well-known and promoted luxury real estate project in Romania. The architects wanted all the elements to be customized, including the elevators. IFMA together with the help of colleagues from MP Spain managed to provide the winning solution for this project. (cabins with a particularly elegant design) The installed elevators are MP Go Evo type 1500kg and 800kg with 14 and 15 stops with a speed of 1.6 m/s 4 elevators were installed in 2021 and we are going to install 4 more by the end of this year. | ![]() ![]() ![]() |
![]() |
SPITALUL DE RECUPERARE PRESIDENT MEDCENTER | Hospital | Passengers | New Construction | MP GO | – | 2021 | 630-1275 kg | Romania | No | It was completed in the fall of 2021, with an investment of 40 million euros and has a total of 4000 m2 built. The new private hospital has revolutionary therapy using modern medical devices and services. It is one of the most modern hospitals in Southeast Europe. MP IFMA installed 4 elevators: 2 with a capacity of 15 people, 7 stations and 2 elevators for 8 people. | ![]() ![]() ![]() |
![]() |
STADIONUL SEPSI ARENA SFANTU GHEORGHE | Public Building | Passengers | Existing Building | MP FLEX | – | 2021 | 1000kg | Romania | Yes | It was inaugurated in October 2021 and primarily serves as the home stadium of Sepsi OSK Sfântu Gheorghe. It is built in the style of the famous Hungarian architects Imre Makovecz and Károly Kós and cost 25 million euros, with a capacity of 8,400 seats. MP IFMA installed three MP FLEX elevators with 3 stations, load 13 people, 1000 kg. One of these elevators is a panoramic elevator on all sides. | ![]() ![]() ![]() |
![]() |
HOTEL MARMOROSCH | Hotel | Passengers | Existing Building | MP Hydro | No | 2021 | 1000kg | Romania | No | Luxury hotel (5*) from the Marriott group, in a grand historical building from 1923, located in the center of Bucharest, with spa center, indoor pool and restaurant. Being a former bank, the theme of this building was wanted to be preserved so that all the finishes and facilities denote elegance and luxury. The project took place between the years 2020-2021 and required a very close collaboration of our team, including MP colleagues in Spain with architects and constructions of the Marriott group as well as with the state authorities. We have offered a hydraulic lift 1000 kg / 3 stations with cabin and glass doors with metal "gold mirror" elements that denote elegance and which fit perfectly into the Art-Deco design of the hotel. | ![]() ![]() ![]() |
![]() |
VICTORIA REZIDENTIAL | Residential | Passengers | New Construction | MP GO | No | 2022 | 630 kg | Romania | No | We have an good partnership with this client from the beginning of his project. We instaled 10 elevators: with a capacity of 6 people 10 stops. Bought are working in duplex mode. Some of the buildings are in construction, the project started about 4 years ago. | ![]() ![]() ![]() |
![]() |
UNDERGROUND MILL OF MINE-ALCALÁ GUADAIRA | Public Building | Passengers | Existing Building | MP Hydro | – | 2023 | 800kg | Spain | Yes | A unique hydraulic infrastructure in Spain. Built between the 14th and 15th centuries, which seems to be the real boom period of the milling industry at Alcalá de Guadaíra. MP Lifts installed a hydraulic lift, model MPH, machine roomless, 800 kg and 2 stops (with double landing at 180º), with a glass car and glass doors. This is a spring or horizontal-wheeled mill, whose peculiarity is that it is underground. This makes it a hypogean or underground mill. It is the only one of its kind in Spain and there is practically no other similar mill in Europe, with the exception of one in Switzerland. The project began with a clear idea, not only to provide an accessibility solution for visitors, but also to be implemented in a building with a singular beauty, blending in and being part of it. | ![]() ![]() ![]() |
![]() |
KEDY PACK SUPERMARKET IN BOBIGNY | Shopping Centre | Passengers | New Construction | MP GO | No | 2023 | 630kg | France | No | MP supplied 2 MP GO of 630 kg, 8 persons for the Kedy Pack supermarket at Bobigny, France. | ![]() ![]() ![]() |
![]() |
ITALIE DEUX SHOPPING CENTRE, PARIS | Shopping Centre | Passengers | New Construction | MP FLEX | No | 2022 | 1000kg | France | No | It is a MP FLEX weighing 1000 Kg, 13 People, serving 3 levels with triple access. Its attractive glass doors and semi-panoramic cab perfectly complement the structure of the shaft and the architecture of the building. | ![]() ![]() ![]() |
![]() |
RESTAURANT LE DOUAR | Shopping Centre | Modular Structure | New Construction | MP GO | No | 2021 | 750kg | Morocco | Yes | It is a lift that leads to the restaurant LE DOUAR in Marrakech, a modern area with shops, cinemas, restaurants and well-known hotels such as the CR7 Hotel and the Movenpick. | ![]() ![]() ![]() |
![]() |
PARK AND RIDE, ORADEA | Public Building | Passengers | New Construction | MP GO | No | 2023 | 630kg | Romania | No | "The first ""park and ride"" underground car park in Oradea was put into use, with 225 places for cars, 31 places for motorcycles, 6 places for charging electric cars and 9 places for vehicles for people with disabilities. This project required sustained efforts from all those involved, especially due to the vestiges discovered on the parking lot site, as a result of the proximity to the Oradea Citadel. But this very fact gives the Cetate parking lot a special air, the vestiges being highlighted through a unique project in Romania. MP provided 4 MP GO 8 person, 630 kg, and 2-3 stops. " | ![]() ![]() ![]() |
![]() |
REFURBISHMENT OF THE FORMER MAIL SORTING CENTRE IN SAINT-BRIEUC | Office | Passengers | Existing Building | MP GO | No | 2023 | 630kg | France | No | Refurbishment of the former mail sorting centre in Saint-Brieuc. Name of the new building: THE STAMP Creation of offices and a restaurant. MP supplied and installed an MP GO lift 630 kg / 8 people 3 levels / double landing SUPRA car | ![]() ![]() ![]() |
![]() |
EHPAD MÉDICHARME, MONTREUIL | Hospital | Passengers | New Construction | MP GO | No | 2022 | 1275/1000kg | France | No | MP has completed the supply and installation of two lifts during the construction of a new sheltered home for elderly dependent person (EHPAD) MEDICHARME, in Montreuil. - MP GO 1275 kg, 17 people, 7 levels, suitable for transporting healthcare beds. - MP GO 1000 kg, 13 people, 6 levels, ideal for moving elderly people and people with reduced mobility, not forgetting the facility's staff. Both units feature connected multimedia screens, essential for broadcasting information as well as real-time lift monitoring. | ![]() ![]() ![]() |
![]() |
HÔTEL MACIÀ SEVILLA KUBB | Hotel | Passengers | Existing Building | MP GO | No | 2019 | 825kg | Spain | No | Hotel Macià Sevilla Kubb, awarded as the best renovated hotel of 2019, offers a unique architectural experience, where each room connects with wonderful courtyards, allegories of the Sun, Earth and Water The building is equipped with MP lifts as a mobility solution: a duplex installation with double landing at 180º, 7 stops and a capacity for 10 people (825 kg). These MP GO lifts with AMBIENTUM car ensure a comfortable and safe experience on each journey. | ![]() ![]() |
![]() |
AMBAR HOTEL | Hotel | Passengers | New Construction | MP Hydro | No | 2024 | 630kg | Romania | No | MP provided lift solutions for Ambar Hotel, a new 4-star hotel in Giurgiu Municipality, Romania: - MP H lift 630 kg, 4 stops, double landing, car series SUPRA and doors (stainless steel) - MP H lift 450 kg, 4 stops, double landing, car series KOLORO White - Epoxy Ral doors - Dumbwaiter lift, 100 kg, 2 stops - Stainless steel car and doors - Freight platform 1000 kg, 2 stops, double landing | ![]() ![]() ![]() |
![]() |
SEPSI ARENA SFANTU GHEORGHE STADIUM, ROMANIA | Public Building | Passengers | Existing Building | MP FLEX | No | 2021 | 1000kg | Romania | Yes | MP installed 3 MP FLEX lifts, 3 stops, for 13 people, 1.000 kg. One of them is a panoramic lift on all sides. The Sepsi Arena Sfantu Gheorghe stadium was inaugurated in October 2021. It is built in the style of the work of the famous Hungarian architects Imre Makovecz and Károly Kós and holds 8,400 seats. | ![]() ![]() ![]() |
![]() |
PULMONOLOGY CENTRE IN BYDGOSZCZ | Hospital | Passengers | New Construction | MP GO | No | 2022 | 2000kg | Poland | No | MP has supplied several lifts for the reconstruction, extension and modernisation project of the Kuyavian and Pomeranian Pulmonology Centre in Bydgoszcz, Poland. The one in the picture is a firefighter lift: MP GO! Evolution 2000 kg, for 26 persons, 4 stops, SUPRA car and doors in stainless steel finish. It is equipped with elements in accordance with the EN 81-72 standard, including: a trap and a telescopic ladder on the car roof and an additional landing operating panel for fire brigade use. | ![]() ![]() ![]() |
![]() |
PULMONOLOGY CENTRE IN BYDGOSZCZ | Public Building | Passengers | New Construction | MP GO | No | 2022 | 630kg | Poland | Yes | Description of the lifts – 2 x MPGO 630 kg, 8 pers. 4 stops, panoramic car murano type – installed in glass structure from local Supplier. We have been cooperating since the tender for this investment. From the beginning, we helped in the optimisation of the project. We proposed a much lighter-looking shaft structure, which produced big savings. Initially, a hydraulic lift was designed, but we were able to convert it to an electric lift without changing the price. Generally, we collaborate a lot to find an optimal solution. | ![]() ![]() ![]() |
![]() |
PRODUCTION FLOOR IN CALOWANIE | Office | Passengers | New Construction | MP GO | No | 2023 | 1000kg | Polald | No | This is the MP GO! Evolution lift recently installed in the MPACK company building in Poland. MPACK manufactures packaging for companies in the cosmetics, parapharmaceutical and food industries. It’s a 2-stop lift, with a stainless-steel finish. In this project, we have worked closely with the architects from the conception of the design to the final implementation with the contractor. | ![]() ![]() ![]() |
PICTURE:
NAME:
BUILDING TYPE:
SOLUTIONS:
TYPE OF INTERVENTION:
MODEL:
ESCALATORS AND MOVING WALKS:
YEAR:
LOAD:
COUNTRY:
PANORAMIC:
DESCRIPTION:
portfolio_meta_wpcf_imagendistribucionen:
© 2022 MP Lifts. All rights reserved.